{"id":1338,"date":"2026-06-05T03:16:27","date_gmt":"2026-06-05T03:16:27","guid":{"rendered":"https:\/\/funyaracking.com\/?p=1338"},"modified":"2026-06-23T12:53:16","modified_gmt":"2026-06-23T12:53:16","slug":"how-to-use-steel-mezzanines-to-double-your-warehouse-space","status":"publish","type":"post","link":"https:\/\/funyaracking.com\/ja\/how-to-use-steel-mezzanines-to-double-your-warehouse-space\/","title":{"rendered":"\u30b9\u30c1\u30fc\u30eb\u88fd\u30e1\u30b6\u30cb\u30f3\u3092\u6d3b\u7528\u3057\u3066\u5009\u5eab\u30b9\u30da\u30fc\u30b9\u3092\u300c2\u500d\u300d\u306b\u3059\u308b\u65b9\u6cd5\u3068\u306f\uff1f"},"content":{"rendered":"\n<div class=\"wp-block-rank-math-toc-block has-palette-color-1-color has-text-color has-link-color wp-elements-a3863aac618afb578fa8854fcf84061e\" id=\"rank-math-toc\"><h2>Table of Contents<\/h2><nav><ul><li><a href=\"#1-why-staying-put-can-be-more-profitable-the-math-behind-space-utilization\">1.Why staying put can be more profitable: the math behind space utilization<\/a><\/li><li><a href=\"#2-what-exactly-is-a-steel-mezzanine\">2.What exactly is a steel mezzanine?<\/a><ul><li><a href=\"#a-free-standing-structural-mezzanine\">A) Free-standing Structural Mezzanine<\/a><\/li><li><a href=\"#b-rack-supported-shelf-supported-mezzanine\">B) Rack-supported \/ Shelf-supported Mezzanine<\/a><\/li><\/ul><\/li><li><a href=\"#3-design-standards-and-the-floor-live-load\">3.Design standards and the floor live load<\/a><ul><li><a href=\"#3-1-live-load-is-not-as-simple-as-just-weighing\">3.1 Live load is not as simple as \u201cjust weighing\u201d<\/a><\/li><li><a href=\"#3-2-can-forklifts-go-onto-the-mezzanine\">3.2 Can forklifts go onto the mezzanine?<\/a><\/li><\/ul><\/li><li><a href=\"#4-floor-load-calculation-from-kg-m\u00b2-to-a-construction-drawing\">4.Floor load calculation: from \u201ckg\/m\u00b2\u201d to a construction drawing<\/a><ul><li><a href=\"#4-1-the-structural-logic-of-the-main-and-secondary-beam-system\">4.1 The structural logic of the main and secondary beam system<\/a><\/li><li><a href=\"#pros-and-cons-analysis-3\">4.2 Column base anchoring: the \u201cfoundation\u201d of the platform<\/a><\/li><\/ul><\/li><li><a href=\"#5-structural-options-floor-decking-guardrails-and-stairs\">5.Structural options: floor decking, guardrails, and stairs<\/a><ul><li><a href=\"#pros-and-cons-analysis-4\">5.1 Three floor deck options<\/a><\/li><li><a href=\"#5-2-safety-accessories-not-decoration\">5.2 Safety accessories, not decoration<\/a><\/li><\/ul><\/li><li><a href=\"#pros-and-cons-analysis-5\">6. Clear height, fire protection, and evacuation<\/a><ul><li><a href=\"#6-1-clear-height-measure-the-lowest-point\">6.1 Clear height (measure the lowest point)<\/a><\/li><li><a href=\"#applicable-scenarios-6\">6.2 Fire zoning and sprinklers<\/a><\/li><li><a href=\"#8-cantilever-racking-the-unit-of-measurement-is-the-arm-not-the-pallet\">6.3 Egress routes<\/a><\/li><\/ul><\/li><li><a href=\"#pros-and-cons-analysis-7\">7. Installation period: why is it three times faster than civil construction?<\/a><ul><li><a href=\"#applicable-scenarios-7\">Typical project timeline:<\/a><\/li><\/ul><\/li><li><a href=\"#structure-and-working-principle-7\">8.Ten hard questions to ask your supplier<\/a><\/li><\/ul><\/nav><\/div>\n\n\n<div class=\"wp-block-post-excerpt\"><p class=\"wp-block-post-excerpt__excerpt\">As warehouse rental rates and land costs continue to soar, &#8220;seeking space vertically&#8221; is far more cost-effective than &#8220;expanding outward&#8221; or &#8220;being forced to relocate. <\/p><\/div>\n\n\n<p class=\"wp-block-paragraph\">A steel mezzanine (or loft\/platform) is not merely a matter of &#8220;adding a few extra shelves,&#8221; but rather involves constructing a structural steel flooring system that creates a partial second\u2014or even multi-level\u2014floor. This system divides your valuable vertical clearance into two parallel operational zones, enabling storage, sorting, packaging, and even office functions to coordinate efficiently across the vertical dimension\u2014thereby directly boosting your warehouse&#8217;s usable floor area by 80% or even 100%.<\/p>\n\n\n\n<h2 id=\"1-why-staying-put-can-be-more-profitable-the-math-behind-space-utilization\" class=\"wp-block-heading\">1.Why staying put can be more profitable: the math behind space utilization<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For most warehouses, the main problem is not that the site is too small, but that the vertical space is severely underused.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Typical clear height under a warehouse eave is around 5.5 m to 7.5 m, but conventional stacking usually uses only about 2.7 m to 3.0 m of that lower space. The remaining 2 m to 4 m of vertical space often becomes nothing more than air, lights, and sprinkler piping.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here is a simple way to think about feasibility:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Second-level usable area ratio \u2248&nbsp;<math xmlns=\"http:\/\/www.w3.org\/1998\/Math\/MathML\"><semantics><mrow><msub><mi>H<\/mi><mrow><mi>n<\/mi><mi>e<\/mi><mi>t<\/mi><\/mrow><\/msub><mi mathvariant=\"normal\">\/<\/mi><mo stretchy=\"false\">(<\/mo><msub><mi>H<\/mi><mrow><mi>n<\/mi><mi>e<\/mi><mi>t<\/mi><\/mrow><\/msub><mo>\u2212<\/mo><msub><mi>h<\/mi><mn>1<\/mn><\/msub><mo>\u2212<\/mo><msub><mi>h<\/mi><mn>2<\/mn><\/msub><mo stretchy=\"false\">)<\/mo><\/mrow><\/semantics><\/math>\uff1a<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u200b<em>H<sub>net<\/sub><\/em> : usable clear height from the floor to the underside of the roof beam or lowest obstruction. This must exclude the lowest point of sprinklers, ducts, and other obstacles.<\/li>\n\n\n\n<li><math xmlns=\"http:\/\/www.w3.org\/1998\/Math\/MathML\"><semantics><mrow><msub><mi>h<\/mi><mn>1<\/mn><\/msub><\/mrow><\/semantics><\/math>: required clear height for the first level, usually 2.5 m to 3.0 m, enough for pallet storage and forklift access.<\/li>\n\n\n\n<li><math xmlns=\"http:\/\/www.w3.org\/1998\/Math\/MathML\"><semantics><mrow><msub><mi>h<\/mi><mn>2<\/mn><\/msub><\/mrow><\/semantics><\/math>\u200b: required clear height for the second level, usually 2.2 m to 2.7 m, enough for picking, office use, or walkways, not including steel beam depth.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Example calculation:<\/strong><br>If the clear height is 7.0 m, with 3.0 m reserved for the first level and 2.5 m reserved for the second level, you still need to subtract about 0.4 m to 0.6 m for the steel beams.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Result: you can often achieve about 95% to 100% of the projected second-floor area, which is close to a true \u201cdouble your space\u201d effect.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the clear height is only 5.0 m, a mezzanine can still be built, but the second level height may drop to around 2.0 m. In that case, it is only suitable for low-profile storage or light picking, and comfort and efficiency will be significantly reduced.<br>That is why clear height is the first and most important factor in determining whether a mezzanine is practical.<\/p>\n\n\n\n<h2 id=\"2-what-exactly-is-a-steel-mezzanine\" class=\"wp-block-heading\">2.What exactly is a steel mezzanine?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">There are two main types\uff1a<\/p>\n\n\n\n<h3 id=\"a-free-standing-structural-mezzanine\" class=\"wp-block-heading\">A) Free-standing Structural Mezzanine<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The load-bearing system is completely independent of the storage racks below. It is built with separate steel columns, such as square tubes or H-beams, together with main H-beams.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Advantages: The ground floor remains fully open with no column obstruction, so forklifts, large equipment, and trucks can move and turn freely. The structure is highly rigid and offers excellent resistance to vibration and torsion. Future modifications, such as removing part of the floor deck, are also more flexible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Disadvantages: The columns take up part of the ground-floor area, and the cost is relatively higher because it requires larger steel sections, stronger anchoring, and greater foundation resistance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Best for: Warehouses that need heavy forklift traffic on the ground floor, large equipment movement, or a very open and unobstructed layout.<\/p>\n\n\n\n<h3 id=\"b-rack-supported-shelf-supported-mezzanine\" class=\"wp-block-heading\">B) Rack-supported \/ Shelf-supported Mezzanine<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This type uses heavy-duty racks as the \u201clegs\u201d of the platform, with steel beams and floor panels installed on top of the racks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Advantages: The racks themselves provide first-level storage space, material usage is efficient, the footprint is small, and the initial investment is lower, making it look very cost-effective.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Disadvantages: The ground floor is divided by rack uprights, which seriously affects forklift visibility and aisle flow. It is extremely sensitive to upright verticality, impact resistance, and load symmetry. If an upright is damaged, the safety of the upper level is directly affected. Its stiffness and torsional performance are also weaker than a free-standing structure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Best for: Light industrial warehouses where only manual pallet trucks operate on the ground floor, goods are relatively light, and high openness is not required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Selection advice:<br>If your warehouse ground floor needs to support counterbalance forklift operations, choose a free-standing structural mezzanine without hesitation. In environments with frequent forklift traffic, a rack-supported mezzanine can create serious safety risks.<\/p>\n\n\n\n<h2 id=\"3-design-standards-and-the-floor-live-load\" class=\"wp-block-heading\">3.Design standards and the floor live load<\/h2>\n\n\n\n<h3 id=\"3-1-live-load-is-not-as-simple-as-just-weighing\" class=\"wp-block-heading\">3.1 Live load is not as simple as \u201cjust weighing\u201d<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In structural design, floor loads are divided into dead load and live load:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Dead load:<\/strong>&nbsp;the weight of the steel structure itself, floor decking, floor finishes, fixed equipment, and partition walls.<\/li>\n\n\n\n<li><strong>Live load:<\/strong>&nbsp;people, forklifts if permitted, palletized goods, and movable equipment.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Common design ranges, which must be confirmed based on local codes and project conditions, include:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Platform Use<\/th><th class=\"has-text-align-left\" data-align=\"left\">Typical Design Live Load<\/th><th class=\"has-text-align-left\" data-align=\"left\">Key Considerations<\/th><\/tr><\/thead><tbody><tr><td>Light picking \/ carton picking \/ office<\/td><td>3.0\u20135.0 kPa (approx. 300\u2013500 kg\/m\u00b2)<\/td><td>People movement, light shelving, filing cabinets<\/td><\/tr><tr><td>General storage \/ packing \/ line-side storage<\/td><td>5.0\u20137.5 kPa (approx. 500\u2013750 kg\/m\u00b2)<\/td><td>E-commerce storage, carton stacking, packing tables<\/td><\/tr><tr><td>Heavy buffer storage \/ equipment base<\/td><td>7.5\u201310.0 kPa+ (approx. 750\u20131000 kg\/m\u00b2+)<\/td><td>Full pallet loads, small equipment bases, requires separate structural verification<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Important note: <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A rated 1000 kg\/m\u00b2 is a uniformly distributed load design value. It does not mean you can place 1000 kg in one square meter as a single concentrated pile. Concentrated loads, such as equipment legs or heavy rack feet, must be checked separately for local bearing capacity.<\/p>\n\n\n\n<h3 id=\"3-2-can-forklifts-go-onto-the-mezzanine\" class=\"wp-block-heading\">3.2 Can forklifts go onto the mezzanine?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Internal combustion forklifts should never be driven onto an upper platform directly, because dynamic loads and localized pressure are difficult to support.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If access to the mezzanine is absolutely necessary, only electric pallet trucks under 1\u20132 tons should be considered, and the structure must be redesigned based on wheel loads (concentrated forces):<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The tire contact area is very small, which can damage the floor like a point blade.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A dedicated traffic path must be defined, and the secondary beams and main beams under that path must be locally reinforced.<\/p>\n\n\n\n<h2 id=\"4-floor-load-calculation-from-kg-m\u00b2-to-a-construction-drawing\" class=\"wp-block-heading\">4.Floor load calculation: from \u201ckg\/m\u00b2\u201d to a construction drawing<\/h2>\n\n\n\n<h3 id=\"4-1-the-structural-logic-of-the-main-and-secondary-beam-system\" class=\"wp-block-heading\">4.1 The structural logic of the main and secondary beam system<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A mezzanine platform usually uses a grid system made up of&nbsp;<strong>main beams<\/strong>&nbsp;(H-beams) and&nbsp;<strong>secondary beams<\/strong>&nbsp;(C\/Z-section steel).<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Main beams (H-beams):<\/strong>&nbsp;These carry the largest bending moment. In structural terms, bending moment&nbsp;<math xmlns=\"http:\/\/www.w3.org\/1998\/Math\/MathML\"><semantics><mrow><mi>M<\/mi><mo>\u221d<\/mo><mi>w<\/mi><msup><mi>L<\/mi><mn>2<\/mn><\/msup><\/mrow><\/semantics><\/math><em>M<\/em>\u221d<em>w<\/em><em>L<\/em>2, and deflection&nbsp;<math xmlns=\"http:\/\/www.w3.org\/1998\/Math\/MathML\"><semantics><mrow><mi>\u03b4<\/mi><mo>\u221d<\/mo><mi>w<\/mi><msup><mi>L<\/mi><mn>4<\/mn><\/msup><\/mrow><\/semantics><\/math><em>\u03b4<\/em>\u221d<em>w<\/em><em>L<\/em>4. The larger the span&nbsp;<math xmlns=\"http:\/\/www.w3.org\/1998\/Math\/MathML\"><semantics><mrow><mi>L<\/mi><\/mrow><\/semantics><\/math><em>L<\/em>, the faster the required beam section inertia&nbsp;<math xmlns=\"http:\/\/www.w3.org\/1998\/Math\/MathML\"><semantics><mrow><mi>I<\/mi><\/mrow><\/semantics><\/math><em>I<\/em>&nbsp;increases.<\/li>\n\n\n\n<li><strong>Secondary beams (C\/Z-section steel):<\/strong>&nbsp;These support the floor decking and transfer the load to the main beams.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Key specification you must request from the supplier:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Deflection control target:<\/strong>&nbsp;For walking areas or light storage, this is usually controlled at&nbsp;<strong>L\/360<\/strong>&nbsp;or&nbsp;<strong>L\/300<\/strong>&nbsp;(meaning allowable deflection of about 2.7 mm\u20133.3 mm per meter of span). If the platform is used for precision equipment, the requirement is even stricter, such as&nbsp;<strong>L\/500<\/strong>.<\/li>\n\n\n\n<li>Without this data, the project is essentially a&nbsp;<strong>\u201cblind box\u201d engineering job<\/strong>.<\/li>\n<\/ul>\n\n\n\n<h3 id=\"pros-and-cons-analysis-3\" class=\"wp-block-heading\">4.2 Column base anchoring: the \u201cfoundation\u201d of the platform<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The column base transfers a large axial force and shear force to the floor slab.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Edge distance:<\/strong>&nbsp;Anchor bolts must be placed away from the slab edge to prevent concrete cracking. If the slab thickness is insufficient (less than 100 mm) or the anchors are near an expansion joint, reinforcement by rebar dowels or local slab thickening is required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pull-out force:<\/strong>&nbsp;Resists overturning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Shear force:<\/strong>&nbsp;Resists horizontal movement.<\/p>\n\n\n\n<h2 id=\"5-structural-options-floor-decking-guardrails-and-stairs\" class=\"wp-block-heading\">5.Structural options: floor decking, guardrails, and stairs<\/h2>\n\n\n\n<h3 id=\"pros-and-cons-analysis-4\" class=\"wp-block-heading\">5.1 Three floor deck options<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Floor System<\/th><th class=\"has-text-align-left\" data-align=\"left\">Best Use<\/th><th class=\"has-text-align-left\" data-align=\"left\">Pros \/ Cons<\/th><\/tr><\/thead><tbody><tr><td><strong>Profiled steel deck + 50\u201380 mm fine concrete topping<\/strong><\/td><td>Heavy loads, noise reduction, epoxy floor finish required<\/td><td><strong>Pros:<\/strong>&nbsp;High rigidity, solid underfoot, and good fire performance.&nbsp;<strong>Cons:<\/strong>&nbsp;Very heavy self-weight, and it places the highest demand on column bases and anchoring.<\/td><\/tr><tr><td><strong>High-density steel planks<\/strong><\/td><td>Light storage, carton picking, fast installation<\/td><td><strong>Pros:<\/strong>&nbsp;Lightweight, quick to install, and good ventilation.&nbsp;<strong>Cons:<\/strong>&nbsp;Noisy, cold in winter, and concentrated loads must be strictly controlled.<\/td><\/tr><tr><td><strong>Steel grating<\/strong><\/td><td>Washdown areas, drainage zones, ventilation-priority spaces<\/td><td><strong>Pros:<\/strong>&nbsp;Permeable, dust-resistant, and slip-resistant.&nbsp;<strong>Cons:<\/strong>&nbsp;Less comfortable underfoot, small items may fall through, and it is not suitable for office use.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 id=\"5-2-safety-accessories-not-decoration\" class=\"wp-block-heading\">5.2 Safety accessories, not decoration<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Guardrails:<\/strong>&nbsp;Height should be at least&nbsp;<strong>900\u20131100 mm<\/strong>&nbsp;depending on local codes, and should include a top rail and a mid-rail.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>100 mm toe boards:<\/strong>&nbsp;A mandatory safety feature that prevents nuts, tools, and cartons from falling from the upper level and injuring people below.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Stairs:<\/strong>&nbsp;Tread dimensions must follow ergonomic principles, the platform edge must include solid fall protection, and storage under the stairs is strictly prohibited.<\/p>\n\n\n\n<h2 id=\"pros-and-cons-analysis-5\" class=\"wp-block-heading\">6. Clear height, fire protection, and evacuation<\/h2>\n\n\n\n<h3 id=\"6-1-clear-height-measure-the-lowest-point\" class=\"wp-block-heading\">6.1 Clear height (measure the lowest point)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The mezzanine top level must be set below the lowest point of sprinkler mains, ducts, lighting bridges, and roof bracing members. In many projects, the clear height may look like 7 m at first glance, but after deducting these obstructions, only about 6.2 m may remain, which means the design must be adjusted immediately.<\/p>\n\n\n\n<h3 id=\"applicable-scenarios-6\" class=\"wp-block-heading\">6.2 Fire zoning and sprinklers<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A mezzanine will fundamentally change:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fire compartment volume calculations.<\/li>\n\n\n\n<li>The sprinkler coverage geometry, especially to prevent the platform deck from blocking water flow.<\/li>\n\n\n\n<li>Smoke stratification and smoke exhaust paths.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Before construction, the mezzanine plan must be submitted to the fire department or a qualified professional consultant for review and approval. Do not build first and apply later, or you may face a forced demolition risk.<\/p>\n\n\n\n<h3 id=\"8-cantilever-racking-the-unit-of-measurement-is-the-arm-not-the-pallet\" class=\"wp-block-heading\">6.3 Egress routes<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">If people will work on the upper level for extended periods, you must provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>At least two escape routes in different directions.<\/li>\n\n\n\n<li>Stairs or exits leading to the outside or to a safe area.<\/li>\n\n\n\n<li>Clear aisles and stairways that remain free from stored goods at all times.<\/li>\n<\/ul>\n\n\n\n<h2 id=\"pros-and-cons-analysis-7\" class=\"wp-block-heading\">7. Installation period: why is it three times faster than civil construction?<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Factory prefabrication:<\/strong>&nbsp;All components are drilled, welded, shot-blasted, and coated in the factory.<\/li>\n\n\n\n<li><strong>Dry installation:<\/strong>&nbsp;There is no wet work on site, except for the concrete floor deck, so there is no curing or waiting period.<\/li>\n\n\n\n<li><strong>Bolted connection:<\/strong>&nbsp;The entire system is assembled with bolts, with no welding sparks and no construction debris.<\/li>\n<\/ul>\n\n\n\n<h3 id=\"applicable-scenarios-7\" class=\"wp-block-heading\"><strong><strong>Typical project timeline:<\/strong><\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Light to medium-duty standard projects:<\/strong>&nbsp;on-site installation in&nbsp;<strong>3 to 7 days<\/strong>.<\/li>\n\n\n\n<li><strong>Heavy-duty projects with concrete pouring and fire protection modifications:<\/strong>&nbsp;<strong>2 to 5 weeks<\/strong>, which is close to a small steel structure project.<\/li>\n<\/ul>\n\n\n\n<h2 id=\"structure-and-working-principle-7\" class=\"wp-block-heading\">8.Ten hard questions to ask your supplier<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>What is the design live load value for the second floor in kPa? Please include it in the contract.<\/li>\n\n\n\n<li>What is the allowable deflection limit for the main beams? For example,&nbsp;<math xmlns=\"http:\/\/www.w3.org\/1998\/Math\/MathML\"><semantics><mrow><mi>L<\/mi><mi mathvariant=\"normal\">\/<\/mi><mn>300<\/mn><\/mrow><\/semantics><\/math>.<\/li>\n\n\n\n<li>What is the guaranteed clear height on the first floor? What is the elevation of the lowest obstruction?<\/li>\n\n\n\n<li>How are the column base anchor bolts specified in terms of size, quantity, pull-out capacity, and edge distance?<\/li>\n\n\n\n<li>What is the floor deck solution, and how is concentrated wheel load, such as from an electric pallet truck, checked?<\/li>\n\n\n\n<li>Do the second-floor guardrail height, toe boards, and opening protection measures comply with the code?<\/li>\n\n\n\n<li>Does the fire sprinkler system need to be extended? Who is responsible for the application and filing process?<\/li>\n\n\n\n<li>Do the stair width, tread dimensions, and number of platform exits meet local regulations?<\/li>\n\n\n\n<li>If the floor slab thickness is insufficient or the slab is located next to an expansion joint, what remedial measures are available?<\/li>\n\n\n\n<li>What documents are included in the delivery package? For example, layout drawings, section drawings, anchor point drawings, load plates, and the maintenance manual.<\/li>\n<\/ol>\n\n\n\n<h4 id=\"comments\" class=\"wp-block-heading\">Comments<\/h4>\n\n\n<div class=\"wpforms-container wpforms-block wpforms-block-89ffb43f-9b91-491f-b0d7-8c490056226d wpforms-render-modern\" id=\"wpforms-1313\"><form id=\"wpforms-form-1313\" class=\"wpforms-validate wpforms-form wpforms-ajax-form\" data-formid=\"1313\" method=\"post\" enctype=\"multipart\/form-data\" action=\"\/ja\/wp-json\/wp\/v2\/posts\/1338\" data-token=\"9cc098e631076c90285526e4f4d52b6d\" data-token-time=\"1783676125\"><noscript class=\"wpforms-error-noscript\">\u3053\u306e\u30d5\u30a9\u30fc\u30e0\u306b\u5165\u529b\u3059\u308b\u306b\u306f\u3001\u30d6\u30e9\u30a6\u30b6\u30fc\u3067 JavaScript \u3092\u6709\u52b9\u306b\u3057\u3066\u304f\u3060\u3055\u3044\u3002<\/noscript><div id=\"wpforms-error-noscript\" style=\"display: none;\">\u3053\u306e\u30d5\u30a9\u30fc\u30e0\u306b\u5165\u529b\u3059\u308b\u306b\u306f\u3001\u30d6\u30e9\u30a6\u30b6\u30fc\u3067 JavaScript \u3092\u6709\u52b9\u306b\u3057\u3066\u304f\u3060\u3055\u3044\u3002<\/div><div class=\"wpforms-field-container\"><div id=\"wpforms-1313-field_1-container\" class=\"wpforms-field wpforms-field-layout\" data-field-id=\"1\"><div class=\"wpforms-field-layout-rows wpforms-field-large\"><div class=\"wpforms-layout-row\"><div class=\"wpforms-layout-column wpforms-layout-column-50\"><div id=\"wpforms-1313-field_2-container\" class=\"wpforms-field wpforms-field-name\" data-field-id=\"2\"><label class=\"wpforms-field-label\" for=\"wpforms-1313-field_2\">Name<\/label><input type=\"text\" id=\"wpforms-1313-field_2\" class=\"wpforms-field-medium\" name=\"wpforms[fields][2]\" aria-errormessage=\"wpforms-1313-field_2-error\" ><\/div><\/div><div class=\"wpforms-layout-column wpforms-layout-column-50\"><div id=\"wpforms-1313-field_3-container\" class=\"wpforms-field wpforms-field-email\" data-field-id=\"3\"><label class=\"wpforms-field-label\" for=\"wpforms-1313-field_3\">Email <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"email\" id=\"wpforms-1313-field_3\" class=\"wpforms-field-medium wpforms-field-required\" name=\"wpforms[fields][3]\" spellcheck=\"false\" aria-errormessage=\"wpforms-1313-field_3-error\" required><\/div><\/div><\/div><\/div><\/div>\t\t<div id=\"wpforms-1313-field_4-container\"\n\t\t\tclass=\"wpforms-field wpforms-field-text\"\n\t\t\tdata-field-type=\"text\"\n\t\t\tdata-field-id=\"4\"\n\t\t\t>\n\t\t\t<label class=\"wpforms-field-label\" for=\"wpforms-1313-field_4\" >Name Email Layout<\/label>\n\t\t\t<input type=\"text\" id=\"wpforms-1313-field_4\" class=\"wpforms-field-medium\" name=\"wpforms[fields][4]\" >\n\t\t<\/div>\n\t\t<div id=\"wpforms-1313-field_11-container\" class=\"wpforms-field wpforms-field-layout\" data-field-id=\"11\"><div class=\"wpforms-field-layout-rows wpforms-field-large\"><div class=\"wpforms-layout-row\"><div class=\"wpforms-layout-column wpforms-layout-column-100\"><div id=\"wpforms-1313-field_12-container\" class=\"wpforms-field wpforms-field-textarea\" data-field-id=\"12\"><label class=\"wpforms-field-label\" for=\"wpforms-1313-field_12\">Comment<\/label><textarea id=\"wpforms-1313-field_12\" class=\"wpforms-field-medium\" name=\"wpforms[fields][12]\" aria-errormessage=\"wpforms-1313-field_12-error\" ><\/textarea><\/div><\/div><\/div><\/div><\/div><script>\n\t\t\t\t( function() {\n\t\t\t\t\tconst style = document.createElement( 'style' );\n\t\t\t\t\tstyle.appendChild( document.createTextNode( '#wpforms-1313-field_4-container { position: absolute !important; overflow: hidden !important; display: inline !important; height: 1px !important; width: 1px !important; z-index: -1000 !important; padding: 0 !important; } #wpforms-1313-field_4-container input { visibility: hidden; } #wpforms-conversational-form-page #wpforms-1313-field_4-container label { counter-increment: none; }' ) );\n\t\t\t\t\tdocument.head.appendChild( style );\n\t\t\t\t\tdocument.currentScript?.remove();\n\t\t\t\t} )();\n\t\t\t<\/script><\/div><!-- .wpforms-field-container --><div class=\"wpforms-recaptcha-container wpforms-is-turnstile\" ><div class=\"wpforms-turnstile\" data-sitekey=\"0x4AAAAAADTIC-O8PMPN0Coy\" data-action=\"FormID-1313\"><\/div><input type=\"text\" name=\"g-recaptcha-hidden\" class=\"wpforms-recaptcha-hidden\" style=\"position:absolute!important;clip:rect(0,0,0,0)!important;height:1px!important;width:1px!important;border:0!important;overflow:hidden!important;padding:0!important;margin:0!important;\" data-rule-turnstile=\"1\"><\/div><div class=\"wpforms-submit-container\" ><input type=\"hidden\" name=\"wpforms[id]\" value=\"1313\"><input type=\"hidden\" name=\"page_title\" value=\"\"><input type=\"hidden\" name=\"page_url\" value=\"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/posts\/1338\"><input type=\"hidden\" name=\"url_referer\" value=\"\"><button type=\"submit\" name=\"wpforms[submit]\" id=\"wpforms-submit-1313\" class=\"wpforms-submit\" data-alt-text=\"\u53d1\u9001\u4e2d\u2026\" data-submit-text=\"Submit\" aria-live=\"assertive\" value=\"wpforms-submit\">Submit<\/button><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/funyaracking.com\/wp-content\/plugins\/wpforms\/assets\/images\/submit-spin.svg\" class=\"wpforms-submit-spinner\" style=\"display: none;\" width=\"26\" height=\"26\" alt=\"\u8aad\u307f\u8fbc\u307f\u4e2d\"><\/div><\/form><\/div>  <!-- .wpforms-container -->","protected":false},"excerpt":{"rendered":"<p>\u5009\u5eab\u306e\u8cc3\u6599\u3084\u571f\u5730\u4fa1\u683c\u304c\u9ad8\u9a30\u3057\u7d9a\u3051\u308b\u4e2d\u3001\u300c\u5782\u76f4\u65b9\u5411\u306b\u30b9\u30da\u30fc\u30b9\u3092\u78ba\u4fdd\u3059\u308b\u300d\u3053\u3068\u306f\u3001\u300c\u5916\u5074\u306b\u62e1\u5f35\u3059\u308b\u300d\u3053\u3068\u3084\u300c\u79fb\u8ee2\u3092\u4f59\u5100\u306a\u304f\u3055\u308c\u308b\u300d\u3053\u3068\u3088\u308a\u3082\u306f\u308b\u304b\u306b\u8cbb\u7528\u5bfe\u52b9\u679c\u304c\u9ad8\u3044\u3002.<\/p>","protected":false},"author":1,"featured_media":1339,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[90,80],"class_list":["post-1338","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-steel-mezzanines","tag-steel-platform"],"blocksy_meta":{"content_style_source":"inherit","has_hero_section":"default","styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":6}},"_links":{"self":[{"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/posts\/1338","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/comments?post=1338"}],"version-history":[{"count":5,"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/posts\/1338\/revisions"}],"predecessor-version":[{"id":1659,"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/posts\/1338\/revisions\/1659"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/media\/1339"}],"wp:attachment":[{"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/media?parent=1338"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/categories?post=1338"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/funyaracking.com\/ja\/wp-json\/wp\/v2\/tags?post=1338"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}